Tales II #123


“Tales II” #123 – class40:
Naval architecture: Botin partners
Engineering: Pure design
Builder: Longitud Cero Composites
Technical management: Michele Molino
Construction method: vacuum GRP/male mould
Lenght: 12,18 m
Beam: 4,5 m
Displacement: 4500 Kg


History: As always the biggest effort in construction involves controlling the weight of the several parts built. For this small version of an IMOCA, with retractable rudders and water ballasts, the most critical part was the design of each one of the molds.


Testimonial
Michele is a serious and committed professional. His experience, expertise and competence coordinating all the parties involved in the construction process have been of great importance in all the projects in which he participated.
Ximo Lopez (Longitud Cero composites)


“Tales II” #123 – class40:
Naval architecture: Botin partners
Engineering: Pure design
Builder: Longitud Cero Composites
Technical management: Michele Molino
Construction method: vacuum GRP/male mould
Lenght: 12,18 m
Beam: 4,5 m
Displacement: 4500 Kg


History: As always the biggest effort in construction involves controlling the weight of the several parts built. For this small version of an IMOCA, with retractable rudders and water ballasts, the most critical part was the design of each one of the molds.


Testimonial
Michele is a serious and committed professional. His experience, expertise and competence coordinating all the parties involved in the construction process have been of great importance in all the projects in which he participated.
Ximo Lopez (Longitud Cero composites)